CALL US NOW!

FAQ's

QUESTIONS / ANSWERS

Frequently Asked Questions

Once Liquid Screed has been poured, it is recommended for foot traffic around 24/48 hrs. Thereafter the property should be kept warm & well ventilated to encourage the drying time and erection of non-load bearing partitions after 7 days.

50mm is the ideal depth for Liquid Screed, this is so that it is at it maximum capacity to be a good heat conductor, aiding the heat transfer and enhancing efficiency. However dependant of your flooring we can offer solutions/recommendations which will be best suited.

It may be expensive to install however the long term investment will mean you save money on energy bills.

Yes of course, we have a overflow board system which will raise the flooring by 16mm, so there will be no need to remover the concrete floor.

Yes, Screed & That offer various flooring solutions to meet all needs and wants to your perfect flooring.

UFH is a specialised job and at Screed & That, our fully trained team know exactly how to install UFH in the right locations to your heat sources. If preparation costs are cut, the installation of UFH can be costly in the future. 

Any Questions? Ask Us!!